Undergraduate Adult Ed & Graduate Academics Alumni & Friends Athletics Giving to CUW News & Events The Arts
Master Plan for Campus
Campus Facilities
Athletics / Recreation
Community Life
Site Improvements
Student Housing
Campus Facilities

Master Plan Facilities

Campus Facilities Improvements

 

New Gate House and Check Point.

 

Projected Project Cost: $150,000 to $200,000 (in 2003 dollars)

 

Improvements will reinforce the image and identity of the University as well as to properly orient the visitor to the “front door” of the campus. Improvements include removing the west campus entry road, improving the remaining east main campus entry road, replacing the entry sign/gateway, extending utilities, and constructing a security checkpoint building. The project includes approx. 400 sq. ft. of new construction.

 

New Maintenance Building

 

Projected Project Cost: $650,000 to $900,000 (in 2003 dollars)

 

A maintenance building for outdoor equipment will be constructed north of the pond in the northwest corner of the campus. The building will be constructed into the hill with the roof providing a plaza at the level of the outdoor stadium. The plaza will accommodate a tent and utilities for outdoor functions. The project includes approx. 7,200 sq. ft of building with a 7,200 sq. ft. rooftop plaza.

New Loading Dock Addition

Projected Project Cost: $350,000 to $500,000 (in 2003 dollars)

This project will route delivery access from the west campus entry to loading docks adjacent to the power house. The project will provide a building with 2 depressed loading docks, and site work surrounding the addition. The project includes 4,000 sq. ft. of new construction.


Upgrade and Remodeling of Existing Facilities

 

Library Renovation

 

Project Cost: Under Construction / Completion 2004

 

The Library will be renovated and reconfigured within its current second floor location in Rincker Hall and the Health Services building. This project is currently in progress.

 

Dining Hall Renovation

 

Projected Project Cost: $800,000 to $1,200,000 (in 2003 dollars).

 

The Dining Hall will be renovated and reconfigured within its current location in Stuenkel Hall. The project will include new ‘Marche’ (market place) concept serving stations, kitchen remodeling, additional new kitchen equipment, and finish upgrades and additional space for private dining. Lighting in the Lakeshore Room will be replaced as part of a project currently underway. The project includes approx. 18,000 sq. ft. of remodeling. The project design is currently under review.
 

Luther Hall Renovation- Faculty Offices

 

Projected Project Cost: $800,000 to $1,200,000 (in 2003 dollars).

 

The Faculty Offices will be renovated and reconfigured within their current location in Luther Hall. The project will remodel the second floor and include HVAC and electrical changes to respond to reconfigurations, modifications to no-load-bearing partitions as required, data/telephone upgrades, as well as localized replacement of finishes and furnishings. The project includes approx. 16,000 sq. ft. of remodeling. The project design is currently under review.
 

Chapel Renovation - Lower Level Offices

 

Projected Project Cost: $500,000 to $600,000 (in 2003 dollars).

 

The Lower Level of the Chapel will be renovated to provide additional offices. The project will include HVAC and electrical changes to respond to reconfigurations, modifications to no-load-bearing partitions as required, data/telephone upgrades, as well as localized replacement of finishes and furnishings. The project includes 16,000 sq. ft. of remodeling.


New Fine Arts Music Building / Chapel Improvements

 

New Music Building

 

Projected Project Cost: $4,000,000 to $5,000,000 (in 2003 dollars).

 

The new music facility will be located adjacent to the Chapel along the north edge of the courtyard. The Music Building is a one-story building with a lower level and will include the following: choral room, band room, hand-bell room, practice rooms, studio offices, a music performance space for approx. 250 persons, lobby space, and storage. The Chapel will still be used as the large capacity venue for performances, although renovations to the Chapel are a separate project. Project costs for the Music Building include a portion of the Chapel Quad renovation. The project includes approx. 32,000 gross sq. ft. of new construction.


Chapel Improvements

 

Projected Project Cost: $600,000 to $900,000 (in 2003 dollars).

 

The Chapel of the Christ Triumphant will be renovated to fulfill the University’s worship needs as well as to enhance its ability to accommodate musical performances. Renovations will include modifications to the sanctuary area, modifications to decorative and sculptural elements, an improved audio system and a new lighting system for the nave and sanctuary areas to better serve worship needs and musical performances, and acoustical treatments.


Preserving Site for Addition and Renovation to Barth Hall Theatre

 

Projected Project Cost: $4,500,000 to $6,000,000 (in 2003 dollars).

 

Land South of Barth Hall is the most feasible location for a future addition and should be kept available for expansion. The theatre project will include the following: a new 200-person black box theatre; new green, dressing and make-up rooms; new scene shop; a new theatre practice room with dance floor; new lobby and additional storage space. Renovation of the existing auditorium will include clearing the existing backstage area for stage/scene use, renovation of the orchestra pit, acoustical modifications to the house, and adding a fly tower with new stage rigging and lighting equipment. Project costs include the construction of a new surface parking lot to replace the existing parking lost to the building expansion. The project includes 22,000 gross sq. ft. of new construction in the addition plus the renovation work.


Renovation and Expansion of Loeber Hall: Visual Arts

 

Projected Project Cost: $1,200,000 to $1,800,000 (in 2003 dollars).

 

The Visual Arts project includes remodeling within Loeber Hall as well as expansion into the Power House for 3-D design studios, student studio/exhibition space and outdoor kiln. Creating additional mezzanine space will be explored in the Power House. The project includes 15,000 gross sq. ft. of renovation.

 

New Conference and Business Center

 

Projected Project Cost: $4,500,000 to $5,500,000 (in 2003 dollars).

 

A new conference and business center is proposed to be located at a site with a direct view of the lake. The conference center includes state of the art large presentation halls/classrooms sub-dividable into meeting rooms for breakout. Catering facilities, lobbies, lounges, and toilet facilities will serve the meeting rooms. The project includes 25,000 sq. ft. of new construction.

 

Renovation of Ball Room: Albrecht Hall

 

Projected Project Cost: $150,000 to $200,000 (in 2003 dollars).

 

 

| Copyright © 1996-2008 | E-mail the Webmaster | 12800 N. Lake Shore Drive, Mequon, WI 53097 | 1.888.628.9472 |